Systems integration
One coordinated production line
Colombian integrators can design, build and commission cells and lines using global robot brands. Define the complete outcome and the responsibility for every interface.
- 01
Engineering and layout
Translate the process into a working layout, cycle-time model and equipment specification. Confirm utilities, foundations and upstream and downstream connections.
- 02
Tooling, controls and safety
Fixtures, end effectors, conveyors, PLCs and safeguarding belong in the same scope. Clarify the destination's compliance requirements before equipment is built.
- 03
Factory acceptance testing
Agree measurable acceptance criteria before placing an order. Use representative parts, production conditions and documented results wherever practical.
- 04
Installation and site acceptance
Plan freight, access, rigging, utilities and commissioning. Identify the local team and the conditions for final acceptance at your facility.
- 05
Training and ongoing support
Include operator and maintenance training, documentation, spare parts and a support escalation path. Establish ownership of software and access rights.
Make proposals comparable
- Use the same specification for each supplier
- Separate equipment, freight and installation costs
- Document exclusions and buyer responsibilities
- Agree milestones and acceptance evidence
Define your complete line
Tell us what you need to automate and where it needs to go.